When Terumo Aortic, a global leader in advanced medical device solutions, faced an unexpected boiler failure at its Inchinnin facility, time and reliability were critical. James Ramsay, working in close partnership with Fulton, delivered a fast, effective solution to keep vital operations on track.

Challenge

A critical boiler at Terumo Aortic had failed, jeopardising production continuity and risking costly downtime. With standard lead times of six weeks for boiler procurement, the urgency of finding a swift and dependable solution was clear. It was essential not only to restore operations quickly but also to offer future resilience against similar disruptions.

Steam is central to Terumo Aortic’s production processes, providing the clean, consistent, and controlled energy required for sterilisation, precise heating, and maintaining the stringent quality standards essential in medical device manufacturing. Without it, production halts immediately — making reliability non-negotiable.

Solution

Terumo Aortic selected Fulton due to its proven track record for reliability, compact design, and efficiency in critical process environments. James Ramsay specified and installed a Fulton VSRT (Vertical Spiral Rib Tubeless) steam boiler, recognised for its high performance, energy efficiency, and ability to be deployed rapidly.

Thanks to strong collaboration with Fulton, James Ramsay delivered a two-week turnaround for assessing the issue, sourcing, and installing the new Fulton boiler — achieving operational handover in just three weeks from failure.

At the same time, our team demonstrated flexibility by repairing the failed boiler, ensuring it could be reinstated as a fully operational standby unit. This dual-track approach provided Terumo Aortic with:

  • Fast-track replacement within half the usual lead time, enabled by Fulton’s rapid support.
  • Restored primary boiler service quickly and professionally.
  • Repaired legacy unit available onsite as a backup for added resilience.

 

Impact

  • Reduced operational downtime: Downtime minimised through Fulton’s rapid supply and our efficient installation.
  • Cost-effective resilience: The repaired boiler now serves as an emergency standby, reducing the need for external contingency solutions.
  • Strengthened critical processes: Reliable steam supply safeguarded the sterilisation and precision heating essential to medical device production.
  • Built trust and confidence: Speed, flexibility, and reliability reinforced the strong partnership between Terumo Aortic, James Ramsay, and Fulton.

 

Robert Welsh, General Manager at Terumo Aortic said: “When our boiler failed, James Ramsay’s team didn’t just solve the problem — they exceeded every expectation. Having a new boiler installed in just three weeks and ensuring our original unit was repaired and available as a backup was invaluable. Their technical know-how and responsiveness kept our operations secure, and we couldn’t have asked for better service.”